How we deliver the Pulse
The Pulse is a 5-day delivery cadence: Discover on Monday, Build through the week, Validate on Friday morning, Learn on Friday afternoon. If your team has run Scrum, the rhythm will feel familiar. Three things make the Pulse different from agile-as-usual: we forecast probabilistically instead of with story points and velocity, you control what goes into each week on Monday morning within a fixed engagement envelope, and AI assistants do real work alongside our consultants throughout the cycle.
Four phases, one cycle
Probabilistic banding instead of story points
Most consultancies and most internal teams use story points and velocity. Story points blur two questions that should stay separate: what kind of work is this? and how likely are we to land it as currently scoped? The Pulse separates them.
Every item in the scope register carries two bands.
Delivery Band
Describes the inherent shape of the work.
Confidence Band
Describes the probability the item lands within its delivery week as currently scoped.
Floor, plan, ceiling
Each week we run a Monte Carlo simulation across the Confidence Bands of the committed items and report three numbers: a floor (your guaranteed delivery, the Committed items), a plan (the realistic target, Committed plus Target), and a ceiling (the upside, all committed items including Stretch). You see all three in your weekly status report. We do not give you a single number that pretends to be precise.
You see the probability-weighted picture of what the engagement will produce, not a velocity chart that has the potential to be misleading.
Floor
CommittedYour guaranteed delivery
The Committed items.
Plan
+ TargetThe realistic target
Committed plus Target.
Ceiling
+ StretchThe upside
All committed items including Stretch.
The Swap Window inside a fixed envelope
Every engagement has a fixed envelope: the number of delivery weeks, the total price, the team composition. The envelope is fixed. What you do with it is variable.
At the start of each Pulse, the Swap Window opens. You can reorder priorities, swap uncommitted items into the upcoming week, and add new items to the register for future weeks. The window closes at Monday noon. After that, the week's items are locked and new requests roll to the following Monday.
How it works is simple: you cannot add items to the current week after the Swap Window closes (surprises are worse than constraints). You can swap items in and out of future weeks any time. You can change priorities any time. The envelope constrains capacity, not what you do with it.
AI assistants embedded in the cycle
AI assistants are not a sidecar; they are part of how every Pulse runs. Some examples include:
Scope register management
Code generation and review
Test authoring
Weekly status and forecasting
Player-Coach: capability transfer at the work-item level
Some customers want their internal team to learn how to run a Pulse alongside us. We have a methodology for that: paired delivery and ceremony coaching for teams with engineers, methodology-level transfer for teams without. If capability transfer is not a goal for your engagement, we deliver and step back. If it is, we plan it explicitly in your Working Agreements.
What "delivered" means
Delivered means the item is in your engagement's delivery target environment (staging or production, set in your Working Agreements) and meets all three of the following:
Our preference is frequent production delivery, since value compounds when accepted items reach users every week. We know the transaction cost varies widely: regulated change windows, downstream dependencies, and customer-side approvals can make a weekly production cadence unrealistic. The cadence is your call.
Deployed to production Friday
- Release gate folded into Friday Validate
- Accepted items reach users each cycle
Accepted to staging Friday
- Accepted items land in staging on Friday
- Release gate fires at the cadence you agree: per Pulse, every few Pulses, or milestone-driven
What you see every Friday
You see how the engagement is performing every Friday, against numbers we agreed to up front, with no story-point translation in between.